CAT Work Applications: Boosting Output, Wages and Efficiency on the Job
Work applications collect output, wages and efficiency into one frame: output = rate × time, wages ∝ work done, and efficiency scales rates. Every variant — workers leaving, machines added, partial completion — is a ledger line in rate units.
Visual Summary
- Output ledger — rate × time per worker group.
- Wages by contribution — rate × days shares.
- Efficiency conversions — ratios of rates.
- Partial handoffs — bank the work done.
Output and Wages Together
A does a job in 10 days, B in 15: rates 1/10 and 1/15 per day. Working 6 days together: 6 × (1/6) = 1 — job done (rates sum to 1/6). If total wages are ₹1,200, shares split by work done — equal days means rate ratio 3:2 → ₹720/₹480. Unequal days (A works 4, B works 6): A gives 4/10, B gives 6/15 = 2/5 each — equal shares, ₹600 each. The wage question never needs the job’s completion; it needs each contributor’s fraction.
Efficiency and Crew Composition
“A man does twice a woman’s work; a woman does thrice a boy’s” → rates 6:3:1 in boy-units. A crew of 3 men, 4 women, 5 boys = 18 + 12 + 5 = 35 boy-units; a job needing 70 boy-days takes this crew 2 days. Adding a mid-job crew change: bank output to the change point, then the new crew clears the remainder at its own rate — the two-ledger structure from the pipes chapter, now with people.
Partial and Alternating Work Patterns
Alternating-day patterns (A one day, B next): per 2-day cycle the pair completes 1/10 + 1/15 = 1/6 — six cycles (12 days) finish, but watch the last day: if the cycle overshoots, the finisher is whoever works the fractional day. “A starts, B joins after 3 days” items bank A’s 3/10 then run the pair. Output targets (“only 80% of the job needed”) scale the target, not the rates. The ledger closes on Σ(rate × days) = target — verify before answering any share or timing question.
Exam Angle
Drill the output ledger in the CAT mock — work applications are accounting with a division at the end.
FAQ
Wages follow what ratio?
Work actually done — rate × days each.
Alternating pattern finisher?
Whoever’s turn covers the leftover fraction.
Related reading
- CAT Journey Profiles: Multi-Phase Travel Bookkeeping
- CAT Geometry Applications: Paths, Fencing and Tiling
Quick revision
- Output ledger: — rate × time per worker group.
- CAT Journey Profiles: Multi-Phase Travel Bookkeeping
- CAT Geometry Applications: Paths, Fencing and Tiling
Have a doubt on this topic?