Quick Answer
Inventory and quality: EOQ balances ordering against holding costs (Q = √(2DS/H)); ABC analysis grades stock by value; JIT minimises buffers; statistical quality control uses control charts and acceptance sampling; six sigma targets 3.4 defects per million.
Visual Summary
- EOQ — √(2DS/H) balances ordering and holding costs.
- ABC — A-items are few but high-value.
- Control charts — separate common from assignable causes.
- Six sigma — 3.4 defects per million opportunities.
Inventory Management
EOQ minimises total inventory cost — ordering cost D/Q times plus holding cost Q/2 times H — giving Q = √(2DS/H); larger orders cut ordering cost but raise holding cost. ABC analysis grades stock: A-items (few, high value) get tight control, B moderate, C loose. JIT pushes buffers toward zero with reliable suppliers and pull signals — waste elimination over safety stock.
Quality Management
Statistical process control plots sample statistics on control charts: points outside control limits (or trending) signal ASSIGNABLE causes needing investigation; random variation within limits is common cause — leave the process alone. Acceptance sampling accepts or rejects lots on sample evidence. Six sigma pursues 3.4 defects per million opportunities via DMAIC (Define-Measure-Analyse-Improve-Control); TQM embeds quality in every function.
Exam Angle
NET passages compute EOQ or classify variation causes on a control chart. Practise in the UGC NET Commerce mock.
FAQ
What signals an assignable cause?
Points outside control limits or non-random patterns within them.
What does EOQ trade off?
Ordering cost against holding cost — the U-shaped total cost’s minimum.
Related reading
- Decision Theory: Expected Values, Trees and Uncertainty Criteria
- Operations Research: Linear Programming and Its Algorithms
Exam angle
How exams use this: CA/Foundation papers mix recall, calculation and application in one sitting — train all three under +1/−0.25. Test it under exam conditions →
Quick revision
- EOQ: — √(2DS/H) balances ordering and holding costs.
- ABC: — A-items are few but high-value.
- Control charts: — separate common from assignable causes.
- Six sigma: — 3.4 defects per million opportunities.
- Decision Theory: Expected Values, Trees and Uncertainty Criteria
- Operations Research: Linear Programming and Its Algorithms
Have a doubt on this topic?








