CAT Time and Work: Rates, Efficiency and the MDH Framework
CAT2 min readNov 23, 2026

CAT Time and Work: Rates, Efficiency and the MDH Framework

CAT Time and Work: Rates, Efficiency and the MDH Framework
2 min read · 345 words

Quick Answer

Time and work runs on rates: a worker finishing in d days works at 1/d per day, rates add, and efficiency multiplies the rate. If A is twice as efficient as B, A’s time is HALF of B’s — efficiency and time are inversely proportional.

Visual Summary

  • Rate = 1/days — add rates, not times.
  • Efficiency inverse — 2× speed = ½ time.
  • Work equation — rate × days = output.
  • MDH formula — M₁D₁H₁/W₁ = M₂D₂H₂/W₂.

Rates Over Times

A finishes in 12 days, B in 18: together they do 1/12 + 1/18 = 5/36 per day → 7.2 days. The recurring error is averaging TIMES (15 days) — always convert to rates first. Leaving-and-joining items track accumulated work: A works 5 days alone (5/12 done), then B joins — the pair clears 7/12 at 5/36 per day → 5.04 more days. Write the work ledger explicitly; every mid-stream change is one more ledger line.

Efficiency and Wage Splits

“A is 60% more efficient than B” → A’s rate = 1.6 × B’s, so A alone would take B’s time ÷ 1.6. Wages split by rates (equal days worked): the 12-day and 18-day pair earns 18 : 12 — wait, wages ∝ work done ∝ rate × days; equal days → ratio of rates = 1/12 : 1/18 = 3 : 2. Men-women-boy items assign efficiency ratios (3:2:1 typical) and total output in person-equivalents — convert everyone to a common unit before counting.

The MDH Framework

Men-Days-Hours-Work: M₁D₁H₁/W₁ = M₂D₂H₂/W₂. 15 men × 8 h × 12 days build 4 walls → 24 men × 9 h need (15·8·12)/(24·9) = 6.67 days for 4 walls, ×2 for 8 walls = 13.3. Pipes-and-cisterns are the same math with negative rates for drains: fill 1/6, drain 1/9 → net 1/18 per hour with both open. Whenever the cast changes (workers quit, pipes open mid-fill), recompute the net rate from that moment — the past is banked work, the future runs at the new rate.

Exam Angle

Drill rate-ledgers in the CAT mock — time-work items are accounting, not algebra.

FAQ

Why not average the days?
Rates add — 1/12 + 1/18, never (12+18)/2.

Twice as efficient means?
Half the time — efficiency ∝ 1/days.

Related reading

Quick revision

  • Rate = 1/days: — add rates, not times.
  • Work equation: — rate × days = output.
  • MDH formula: — M₁D₁H₁/W₁ = M₂D₂H₂/W₂.